Construction works for oil wells in Rumaila oilfields
The work included in this contract covers 119 call offs to construct different oil pads, removal of old ones and implementing all earthwork.
The work included in this contract covers 119 call offs to construct different oil pads, removal of old ones and implementing all earthwork.
Basrah Mas proceeded with the construction of Berths No. 25 and 26 with a quay structure of 300 m X 42 m and more than 250,000 m2 of stacking yards.
Basrah Mas was selected as a sole main contractor to International Container Terminal Services Inc. (ICTSI) to construct
three berths at their Basrah Gateway Terminal (BGT) in Umm
Qasr Port.
Basrah Mas was contracted by Prime power on behalf of GCPI to design and construct a 10″ main gas pipeline feeder of 15 km length to feed Umm Qasr gas fired power plant.
All building composing the powerplant projects were executed which included, powerhouse and engine room, control building, filters structure & main gas feeding line.
A total of 800,000 cubic meters of materials were dredged in front of berth 27 to reach to navigational depths in accordance with requirement of Umm Qasr port navigational depths.
Construction of 10 tanks for storing raw edible oil of 4,000 tons each as well as ship unloader and truck loading station with all piping and pumps
Construction of stacking yard, cathodic protection revamping for the berths, fences and guardrails and all electrical system.
The company headquarter is plotted over an area of 700 m2 with over 2,000 m2 of offices, meeting areas & waiting areas …