The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
Development / Construction
Client
Gulftainer / UAE
Start Date
01/05/2009
Contract
EPC
Duration
15 Months
Construction of interlock paved 150,000 m2 area for containers stacking. The project included construction of all operation building and services along with perimeter security fence.
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
Construction of interlock paved 55,000 m2 area for containers stacking.
An area for containers handling and storage with a total area of 100,000 m2 with multi-functional covered storages and ancillary buildings.