Dredging work in front of berth No.27
A total of 800,000 cubic meters of materials were dredged in front of berth 27 to reach to navigational depths in accordance with requirement of Umm Qasr port navigational depths.
Development / Construction
Client
ICTSI/ BGT
Start Date
05/09/2018
Contract
Unit Price
Duration
12 Months
For phase 2 of the Three Berths contract with International Container Terminal Services Inc. (ICTSI)/Basrah Gateway Terminal (BGT) in Umm Qasr Port, Basrah Mas proceeded with the construction of Berths No. 25 and 26 with a quay structure of 300 m X 42 m and more than 250,000 m2 of stacking yards.
A total of 800,000 cubic meters of materials were dredged in front of berth 27 to reach to navigational depths in accordance with requirement of Umm Qasr port navigational depths.
Basrah Mas was selected as a sole main contractor to International Container Terminal Services Inc. (ICTSI) to construct
three berths at their Basrah Gateway Terminal (BGT) in Umm
Qasr Port.