Development / Construction

AlMaqel Pedestrian bridge

Client

General Company for Ports of Iraq (GCPI)

Start Date

01/09/2018

Contract

EPC

Duration

5 Months

The philosophy of this project is to connect the family park new projects (Bowling center, Mas cinema and the park) to the extension of the family park on the other bank of the river. The design and construction of the bridge was totally handled by the company and the main engineering challenge was floating and hauling the bridge in position.