Iraqi Container Terminal (ICT) at Umm Qasr port
Construction of interlock paved 150,000 m2 area for containers stacking.
Development / Construction
Client
General Company for Ports of Iraq (GCPI)
Start Date
01/05/2009
Contract
EPC
Duration
15 Months
The work constituted of constructing the quay structure and all ancillaries, as well as constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor
Construction of interlock paved 150,000 m2 area for containers stacking.
An area for containers handling and storage with a total area of 100,000 m2 with multi-functional covered storages and ancillary buildings.
The General Company for Ports of Iraq (GCPI) required a Control tower in Umm Qasr Port. The total height of the concrete tower is 45m with an observation chamber on top equipped with communication system, telescope system and radar unit.